Indiana Toll Road (ITR) over SR 12

Bridge Design


  Location:  

  Gary, Indiana

  Owner:    

  State of Indiana

  Client:    

  Ferrovial Agroman US Corp

  Construction Cost:    

  $25 Million
 

Project Description

This structure is a 2600’ long, 40 span viaduct situated between the Grand Calumet River and the City of Gary Sewage Treatment Plant. In order to expedite the permitting process and construction schedule, JSE redesigned this structure for narrower shoulders adjacent to the river to eliminate the in-water construction. A design exception for narrow shoulders was successfully applied for and the ACOE permit was no longer required because the in-water construction was eliminated.

To further expedite the construction, precast bent caps were designed. This eliminated the time and effort for conventional forming and pouring, allowing each cap to be installed in one or two days instead of a week or more. Welded Wire Reinforcing was used for the bridge deck to reduce construction time and labor costs. Two lanes of traffic were maintained for the duration of the construction.