Crawford Bridge 45

Bridge Rehab


  Location:  

  Alton, Indiana

  Owner:    

  Crawford County

  Client:    

  INDOT

  Construction Cost:    

  $766,000
 

Print

Project Details

JSE provided bridge design and construction inspection services for the rehabilitation of Bridge #45 in Alton, IN. The project was funded through the Transportation Enhancement program. The project involved restoration of a historic 5-span, single lane truss bridge. The project included reconstruction of the approach roadways. JSE provided inspection for the cleaning and painting, structural repairs, layout, approach reconstruction, installation of new railing and new timber bridge deck.