Henryville Sanitary Sewer Extension


  Location:  

  Henryville, Indiana

  Owner:    

  INDOT, IN Dept. of Corrections, IN Dept. of Natural Resources, Henryville
  Sanitary Corp. 

  Client:    

  INDOT

  Construction Cost:    

  $650,000
 

Project Description

JSE provided design services for three major sanitary sewer line extensions to serve three government facilities. The first site was a highway rest area. This site required a new lift station to service the rest area plus additional customers. The lift station was designed to discharge over 150,000 gallons per day through a 5 mile long force main. The second service sight was a minimum security prison. Design involved the addition of a lift station to discharge over 80,000 gpd through a 1.5 mile long force main traversing very rolling terrain. The last sight to serve was a horse camp. Two lift stations were installed. One to serve the camp and the RV dump station. The other was to serve the office and maintenance complex of the state forest. Considerable coordination was required between the three government agencies and the local sanitary corporation.