US 50 Erosion Correction


  Location:  

  Ripley County, Indiana

  Owner:    

  INDOT

  Client:    

  INDOT

  Construction Cost:    

  $500,000
 

Project Description

JSE provided the design for a pile & lagging wall along US Hwy 50. The wall was designed to replace an existing gabion wall that had failed. The wall supports a wooded slope in Versailles State Park. The piles are embedded 12 feet into bedrock with precast concrete lagging panels spanning between the piles.