Wakota Bridge over Mississippi River (MN)
Project Type: Construction Engineering
Location: Minneapolis, Minnesota
Owner: Minnesota DOT
Client: Lunda Construction Co.
Construction Cost: $63 million
Completion Date: 2010
This bridge is a five-span CIP segmental structure with a 142 m main span constructed on integral piers. JSE provided a stress/capacity design check of the superstructure and substructure for each step of erection; including time effects for creep and shrinkage and unbalance moments during weekly cycles. Services included the casting curve to control geometry for the 72 m cantilevers.
JSE also provided tendon-stressing instructions and integrated shop drawings for placement of rebar and post-tensioning hardware. Our services included the design of falsework towers and soffit to support the end-span segments. Periodic site visits were made to assist with construction and post-tensioning operations.
Total Length: 576m
Number of Spans: 5 (83m, 100m, 2 at 142m, 109m)
Box Width: Varies @ 25.9m to 32m
ARTICLES
ASBI Segments: Project News - ASBI, Summer 2003
Looking to the Future - ASPIRE, Fall 2010